Stairway Addition Project

Stairway Addition in Bennington VT

Clayton Construction removed the front door with sidelights, added a new window and door, and reworked all the electrical work for the stairs space upstairs and down. Removed floating flooring and installed the stairwell, built the stair system, added guard railing and hand railings, insulated the stairway with 2" ridged foam, framed, sheetrocked and fire taped. We did as much work as the client wanted as they were going to do the finish.

Click on any of the photos to enlarge  

Share by: